Yesterday we finished up the flooring for the bonus room above the garage. Starting at the stairs, we gradually got the entire surface above the floor joists covered with tongue-in-groove flooring OSB. After cutting to size, we hauled the pieces up the stairs, glued along each joist, maneuvered the wood into place and then screwed into the joists securely.